Just wanted to share an update on the kitchen remodel progress...
It's going slow but we made huge strides this weekend. It already looks a million times better, even with a sink full of unpacked dishes to wash.
Of course it hasn't been without incident and I'll be sure to share all that later. As for now, here's what we still need to do...
1. Install backslash
2. Fix wood under the sink
3. Paint door hinges
4. Paint doors
5. Install door pulls and doors
6. Paint vent hood
7. Paint walls
8. Install new ceiling light
9. Install under-cabinet light
10. Add a ground outlet for microwave
11. Cut out bar window
12. Acquire a bar cart
A lot of those are long term plans but I cannot wait for it to be done :-)
It's going slow but we made huge strides this weekend. It already looks a million times better, even with a sink full of unpacked dishes to wash.
Of course it hasn't been without incident and I'll be sure to share all that later. As for now, here's what we still need to do...
1. Install backslash
2. Fix wood under the sink
3. Paint door hinges
4. Paint doors
5. Install door pulls and doors
6. Paint vent hood
7. Paint walls
8. Install new ceiling light
9. Install under-cabinet light
10. Add a ground outlet for microwave
11. Cut out bar window
12. Acquire a bar cart
A lot of those are long term plans but I cannot wait for it to be done :-)